That does not mean you should use a 80 amp ocpd it just means that is the largest you can use in your application.
Fuse between solar panel and controller.
In a parallel system a combiner box is used that holds the fuses breakers to each panel plus one or more combined fuse leading to the charge controller or grid tie inverter see figure.
The second fuse between your solar panels and charge controller is a little bit different to figure out.
The load terminal of the solar controller can be connected with a dc power device which is the same working voltage as the rated voltage of the battery and the controller supplies power to the load with the battery voltage connect the positive and negative poles of the load to the load terminals of the controller there may be voltage on the load side please be careful to avoid a short circuit when connecting the load a fuse should be connected to the positive or negative cord of the load.
With an 8 awg copper conductor between the controller and battery you can use a fuse or breaker up to 80 amps using a 90 degree conductor insulation in free air.
If the panels are connected in series the voltage of each panel is added but the amperage stays the same.
I need to put a fuse between the battery and the solar controller.
When sizing this combined fuse breaker we must first determine the worst case current that will flow based on our specific panels.
For that setup you will not need fuses between the solar panels and the charge controller.