Gacoroof 100 silicone roof coating creates a seamless membrane to seal and repair existing roofs and permanently protect against leaks permanent ponding water and the damaging effects of severe weather.
Gaco roof dry time.
Smooth roofs can be completed in 2 coats lightly textured surfaces often require 3 coats and heavily textured surfaces may require 4 coats to achieve a final 22 dry mil film build.
Do not apply in temperatures below freezing above 120 f 49 c or if rain is expected within 2 hours.
Application of top coats.
Do not apply in temperatures below freezing above 120 f 49 c or if rain is expected within 2 hours.
Allow 1st coat to dry thoroughly between 3 12 hours depending on climate before applying the 2nd coat.
It was developed to encapsulate the oil that commonly exudes from asphalt substrates and effectively traps it within the sealer to inhibit bleed through.
Coat within 48 hours.
Gaco reveals revised 1 hour re entry time for trade workers with industry leading 10 ach.
Ideal for use on flat and sloped roofs including but not limited.
Allow the first coat to dry a minimum of 3 12 hours or until it can be walked on before coating with gacoroof 100 silicone roof coating product is moisture cure low humidity will result in longer dry times.
Gacopatch is now available in both a 2 gallon pail and a sausage tube.
Updates to the tax cuts and job act for 2019.
Allow a minimum of 12 hours before applying top coat.
Allow 1st coat to dry thoroughly between 3 12 hours depending on climate before applying the 2nd coat.
Gacoflex bleedtrap is a single component easy to apply water based sealer for use on asphalt roofing substrates containing bitumen including built up roofing bur all types of modbit and smooth or granulated asphaltic roofing membranes.
22 dry mils applying temperature.
Gaco is a best in class provider of silicone roof coating systems waterproofing and insulation solutions for commercial and residential buildings.
One 5 gallon pail covers 250 square feet of roof with 2 coats.
Eliminates the need for primer on most substrates compared to previous generation gacoflex silicone coatings.
It is a one step application which reduces labor time.
Three years from date of manufacture when stored in unopened containers between 40 85 f 4 29 c.
Clean up maintenance.
While bleedtrap will exhibit early rain resistance in as little as 30 minutes it should be allowed to thoroughly dry prior to application of primer or top coat.